river aire | New Civil Engineer https://www.newcivilengineer.com Civil engineering and construction news and jobs from New Civil Engineer Fri, 22 Nov 2024 09:36:53 +0000 en-GB hourly 1 https://wordpress.org/?v=6.0 https://emap-romulus-prod.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/9/2023/07/favicon-nce192x-70x70.png river aire | New Civil Engineer https://www.newcivilengineer.com 32 32 https://www.newcivilengineer.com/wp-content/themes/mbm-mops-2017/images/logo.gif New Civil Engineer https://www.newcivilengineer.com 125 75 Civil engineering and construction news and jobs from New Civil Engineer Leeds’ flood protection enhanced after 10-year scheme adopts mix of new and well-tried solutions https://www.newcivilengineer.com/in-depth/leeds-flood-protection-enhanced-after-10-year-scheme-adopts-mix-of-new-and-tested-solutions-22-11-2024/ https://www.newcivilengineer.com/in-depth/leeds-flood-protection-enhanced-after-10-year-scheme-adopts-mix-of-new-and-tested-solutions-22-11-2024/#comments Fri, 22 Nov 2024 04:00:23 +0000 https://www.newcivilengineer.com/?p=286479 Completion of a 10-year programme of work in Leeds this autumn has delivered 1 in 200-year flood protection for the city and some engineering firsts for the UK too.

The post Leeds’ flood protection enhanced after 10-year scheme adopts mix of new and well-tried solutions appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/in-depth/leeds-flood-protection-enhanced-after-10-year-scheme-adopts-mix-of-new-and-tested-solutions-22-11-2024/feed/ 1
Flood alleviation scheme in Leeds progressing well as work to link drainage network begins https://www.newcivilengineer.com/latest/flood-alleviation-scheme-in-leeds-progressing-well-as-work-to-link-drainage-network-begins-23-08-2023/ https://www.newcivilengineer.com/latest/flood-alleviation-scheme-in-leeds-progressing-well-as-work-to-link-drainage-network-begins-23-08-2023/#respond Wed, 23 Aug 2023 04:30:53 +0000 https://www.newcivilengineer.com/?p=266318 The £112M Leeds Flood Alleviation Scheme Phase 2 (LFAS2) is progressing well according to the city’s council as a six month road closure begins today.

The post Flood alleviation scheme in Leeds progressing well as work to link drainage network begins appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/flood-alleviation-scheme-in-leeds-progressing-well-as-work-to-link-drainage-network-begins-23-08-2023/feed/ 0